国产三级精品三级在专区中文,日韩久久久黄色,杭州精品少妇HD,大鸡巴日比小视频一二区

山東創(chuàng)杰智慧裝備科技有限公司

18563723072
0534-5670558

山東創(chuàng)杰智慧快速發(fā)展,業(yè)績(jī)突出,涉及煤礦機(jī)械、石油機(jī)械、工程機(jī)械、化工機(jī)械、壓力容器、風(fēng)電、核電、專用車、汽車、客車、造船行業(yè)等,近年來在新能源客車噴粉領(lǐng)域取得優(yōu)異的成績(jī)

查看更多+

 公司團(tuán)隊(duì)專注于整廠表面處理、涂裝、環(huán)保設(shè)備的研發(fā),如噴漆房、烘干房、打磨房、噴砂房、拋丸房、焊煙除塵設(shè)備、鑄造除塵除廢氣設(shè)備、布袋除塵器、濾筒除塵器、旋風(fēng)除塵器、VOCs廢氣處理設(shè)備、沸石轉(zhuǎn)輪+RCO、沸石轉(zhuǎn)輪+RTO、活性炭吸附脫附+催化燃燒設(shè)備、噴漆線、噴粉線、電泳線、前處理線、涂裝線、自動(dòng)涂裝線等環(huán)保設(shè)備交鑰匙工程。

查看更多+
RTO廢氣處理的工藝要注意什么?
來源:http://www.1122pvbj.cn/ 發(fā)布時(shí)間:2023-10-09
把有機(jī)廢氣加熱升溫至800℃,使廢氣中的VOC氧化分解,成為無(wú)害的CO2和H2O;氧化時(shí)的高溫氣體的熱量被蓄熱體“貯存”起來,用于預(yù)熱新進(jìn)入的有機(jī)廢氣,從而節(jié)省升溫所需要的燃料消耗,降低運(yùn)行成本。
Heat the organic waste gas to 800 ℃ to oxidize and decompose the VOC in the waste gas into harmless CO2 and H2O; The heat of the high-temperature gas during oxidation is "stored" by the heat storage body for preheating the newly entered organic waste gas, thereby saving fuel consumption required for heating and reducing operating costs.
1、有機(jī)廢氣經(jīng)高壓引風(fēng)機(jī)進(jìn)入蓄熱室1的保留了上一循環(huán)熱量的陶瓷介質(zhì)層后,陶瓷釋放熱量,溫度降低,而有機(jī)廢氣吸收熱量,溫度升高。廢氣離開蓄熱室后,以較高的溫度進(jìn)入燃燒室,準(zhǔn)備進(jìn)行氧化。
1. After the organic waste gas enters the ceramic medium layer in the heat storage chamber 1 through a high-pressure induced draft fan, which retains the heat of the previous cycle, the ceramic releases heat and the temperature decreases, while the organic waste gas absorbs heat and the temperature increases. After leaving the heat storage chamber, the exhaust gas enters the combustion chamber at a higher temperature and is ready for oxidation.
2、在燃燒室中,有機(jī)廢氣再由燃燒器加熱燃燒,加熱升溫至設(shè)定的氧化溫度,此時(shí)溫度為設(shè)定的800℃,使有機(jī)物被分解成二氧化碳和水。由于廢氣已在蓄熱室1內(nèi)進(jìn)行過預(yù)熱,燃燒器的燃料用量大為減少。
2. In the combustion chamber, the organic waste gas is then heated and burned by the burner, heated to the set oxidation temperature, at which point the temperature is set at 800 ℃, causing the organic matter to be decomposed into carbon dioxide and water. Due to the preheating of the exhaust gas in regenerative chamber 1, the fuel consumption of the burner has been greatly reduced.
RTO廢氣處理設(shè)備
3、廢氣流經(jīng)蓄熱室1升溫后進(jìn)入氧化室焚燒,成為凈化后的高溫氣體后離開氧化室,進(jìn)入在上一循環(huán)已冷卻的蓄熱室2。在此氣體釋放熱量,降溫后排出,而蓄熱室2吸收大量熱量后升溫,其吸收的熱量用于下一個(gè)循環(huán)加熱廢氣。在此同時(shí),廢氣引風(fēng)機(jī)經(jīng)由反吹風(fēng)管,從蓄熱室3抽出少許前一循環(huán)殘留在其中的微量有機(jī)氣體,回送至廢氣風(fēng)機(jī)進(jìn)口處,再送入燃燒室中進(jìn)行焚燒,此部分氣體同處理后氣體一起離開蓄熱室2,經(jīng)熱回收設(shè)備排入大氣。
3. The exhaust gas flows through the heat storage chamber 1 and is heated before entering the oxidation chamber for incineration, becoming a purified high-temperature gas before leaving the oxidation chamber and entering the previously cooled heat storage chamber 2. Here, the gas releases heat, which is cooled and discharged, while the heat storage chamber 2 absorbs a large amount of heat and heats up. The heat absorbed by it is used to heat the exhaust gas in the next cycle. At the same time, the exhaust gas induced draft fan extracts a small amount of organic gas remaining in the previous cycle from the heat storage chamber 3 through a reverse blowing duct, returns it to the inlet of the exhaust gas fan, and then sends it to the combustion chamber for incineration. This part of gas, along with the processed gas, leaves the heat storage chamber 2 and is discharged into the atmosphere through a heat recovery device.
4、在燃燒室中,有機(jī)廢氣再由燃燒器加熱燃燒,加熱升溫至設(shè)定的氧化溫度,此時(shí)溫度同樣為設(shè)定的800℃,使有機(jī)物被分解成二氧化碳和水。由蓄熱室3排出。
4. In the combustion chamber, the organic waste gas is heated and burned by the burner, heating it up to the set oxidation temperature. At this time, the temperature is also set at 800 ℃, causing the organic matter to be decomposed into carbon dioxide and water. Discharged from regenerative chamber 3.
5、在此同時(shí),由廢氣引風(fēng)機(jī)抽出少許前一循環(huán)殘留在蓄熱室1中的微量有機(jī)氣體,再送至燃燒室中進(jìn)行焚燒,此部分氣體同處理后氣體一起離開蓄熱室3,經(jīng)熱回收設(shè)備排入大氣。如此交替循環(huán)。
5. At the same time, a small amount of residual organic gas from the previous cycle in the heat storage chamber 1 is extracted by the exhaust gas induced draft fan, and then sent to the combustion chamber for incineration. This gas, along with the treated gas, leaves the heat storage chamber 3 and is discharged into the atmosphere through a heat recovery equipment. This alternating cycle.

上一篇:沸石轉(zhuǎn)輪廢氣處理技術(shù)要注意哪些內(nèi)容?
下一篇:活性炭吸附設(shè)備效果下降的原因有哪些?

  • 服務(wù)熱線: 18563723072
  • 官方微信
妓女妓女影院妓女影库妓女网 | 任我爽精品视频在线观看| 中国老太性开放| 国产成人一区二区三区在线| 国产手机精品一区二区 | 欧美性生交xxxxx久久久| a国产在线V的不卡视频| 欧美一级免费| 午夜男女爽爽影院网站| 无码专区亚洲制服丝袜| 久久99天堂av亚洲av| 国产午夜福利在线观看视频| 国产又色又爽又刺激视频| 精品久久久久久| 免费观看美女裸体的网站| 牲zoz0交体内另类吊类的头交| 精品国产三级a∨在线| 秋霞欧美| 亚洲色成人网站www永久小说| 精品人妻一区二区三区久久夜夜嗨| 黄网站欧美内射| 日韩免费电影| 999久久久无码国产精品| а√最新版地址在线天堂| 五月天色| 亚洲午夜国产精品无码老牛影视| 成人免费无码H在线观看不卡| 色97| 成人精品视频99在线观看免费| 狠狠躁日日躁夜夜躁2020| 久久日韩| 国产亚洲观看无码等最新內容| 亚洲国产精品无码中文字满| 夏津县| 一二三四区无限2021| 国产精品毛片大码女人| 欧美黑人欧美精品刺激| 超碰人人射| jazzjazz国产精品一区二区| 99久久综合狠狠综合久久| 人人妻人人澡人人爽人人欧美一区|